Performing 2 horizontal drillings in the project to relocate source lines along Highway 461 between the Altalef Interchange and the Hayatisim Interchange, one drilling using the micro-thrust method with a closed head in a steel sleeve with a diameter of 48" and a length of approximately 120 m, and a second spiral drilling with a diameter of 48" and a length of approximately 49 m.
Invitation for Bids
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any updates, corrections, or complaints related to this notice, please contact the responsible purchaser directly.
