Gros-Oeuvre: Reinforced Concrete, Wooden Construction And Metal Structure; Infrastructure Works: Buried Networks, Pipelines And Retention Basins, Outdoor Layout: Embankment, Steam Installation, Roads With A Bus Stop; Networks: Evacuation Pipe Under Building, Integration Of Sheaths Into Concrete; Site Installation: Containers, Electrical Distribution, Site Fence. The Start Of The Work Is Scheduled For 18.08.2025. The Overall Duration Of The Work Is 570 Working Days (EXPIRED)