Search      Advanced Search

Clean-up of Nura River and Zhaur Swamp

Prequalification Notice

General Information

Country:   Kazakhstan
City/Locality:   Temirtau
Publication Date:   Mar 14, 2005
Deadline:   Apr 19, 2005
Funding Agency:   World Bank
Buyer:   Nura River Clean-Up Project. Committee for Water Resources
Original Language:   English

Contact Information

Address:   Mr. Anatoliy Ryabtsev
Committee for Water Resources
28-A, Mozhaiskiy Str.
Astana 010000
Kazakhstan
Telephone:   7 (3172) 35-67-76
Fax:   7 (3172) 35-67-70
Email:   Click here

Goods, Works and Services

 

Original Text

     view in:

INVITATION TO PREQUALIFICATION
Republic of Kazakhstan

“Nura River Clean-Up” Project

IBRD Loan No 46930 KZ
Project ID 059803

CONTRACT NRC-A3 "Clean-up of Nura River and Zhaur Swamp"

The present Invitation to Prequalification follows the General Procurement Notice with regard to this Project advertised in “Development Business” on April 24, 2003.

The Republic of Kazakhstan has received a loan from the International Bank for Reconstruction and Development (IBRD) for the “Nura River Clean-Up” Project and intends to apply part of the proceeds of this loan to payments under the contract NRC-A3 "Clean-up of Nura River and Zhaur Swamp". The contract will be co-financed by the Government of the Republic of Kazakhstan. The bidding will be held in line with the guidelines and procedures of the World Bank.
The main assignment is the excavation of polluted soils and ashes in the amount of approximately 2 million m³ and the transport to a proposed landfill site. The main pollution is located along a 30 km stretch of the Nura river, downstream of Temirtau. The main quantities are at river banks, but also include river bed sediments, polluted spots at the flood plains and parts of the Zhaur swamp.
(i) a detailed pre-excavation investigation program to verify exact location and volumes of excavation;
(ii) Preparation of working documentation;
(iii) final design and construction of temporary dams and channels/ pipelines to divert the river;
(iv) ) establishment of black zones and construction of temporary transfer stations and access roads
(v) removal of vegetation, temporary storage and reuse of bush material for re-cultivation and river bank stabilization;
(vi) excavation of polluted material (dry and wet) and transport to transfer station under specified moisture conditions;
(vii) load material on large trucks and transport under specified surveillance to the proposed landfill site at Apan, near Temirtau which will be constructed under another contract;
(viii) re-cultivation of the river banks and backfilling of excavation spots, after the clean-up success has been certified by the Supervision Engineer;
(ix) removal of temporary structures.

The construction period will be 2 years in total, but works are limited to about 6 months per year due to river flow and weather conditions.

The Committee for Water Resources of the Ministry of the Agriculture (MOA) of the Republic of Kazakhstan intends to hold prequalification of Contractors and/or firms to undertake the activities described above. It is planned to make the invitation to Bid in April 2005.

Prequalification will be carried out using prequalification procedures set forth in the World Bank document “Guidelines: IBRD Loand and IDA Credits Procurements”, January 1995 (revised in January and August 1996, September 1997 and January 1999), and is open for all eligible countries’ Bidders as is specified in the Guidelines.

Interested eligible Bidders can obtain further information and study prequalification documents in the Committee for Water Resources of the MOA of RK (see the address below) from 9.00 a.m. till 04.00 p.m.

The full prequalification documents package in English can be obtained by interested Bidders following the submission of the written application and payment of a nonrefundable fee at the address below.

Nonrefundable payment:

- for foreign companies - 150 USD (United States Dollars);
- for local companies – 9 000 KZT (Kazakhstani Tenge).

Payment shall be transferred to:

- in USD:

Payee: Treasury Committee of the Ministry of Finance of the Republic of Kazakhstan, Astana City, TRN 031 400 128 626, account No 001 099 401
Correspondent Account of the Treasury in the Accounting Department of the National Bank of Kazakhstan No 001 073 140 – in USD.
Beneficiary of the National Bank of Kazakhstan: Federal Reserve Bank of New York, USA, SWIFT: FRNYUS33 N 021087219
Revenue BCC (Budget Classification Code) – 203101 “State Procurements earnings organized by the state institutions funded from the Republican Budget”.

- in KZT (national currency of the Republic of Kazakhstan):

Payee: Tax Committee of the Ministry of Finance of the Republic of Kazakhstan, Astana City, TRN 032 200 000 017, account No 000 080 900 for the Treasury Committee of the MOF of RK, BIC 195 301 070, Code – 11, Revenue BCC – 203101 “State Procurements earnings organized by the state institutions funded from the Republican Budget”.

The documents will be sent via international delivery service.

Applications to participate in Prequalification shall be submitted in sealed envelopes clearly marked “Application to Prequalification within the “Nura River Clean-Up” Project, NRC-A3 "Clean-up of Nura River and Zhaur Swamp" and delivered to the address below by April 19, 2005.

Attention: Mr. Anatoliy Ryabtsev
Chairman, Committee for Water Resources of the MOA of RK
28A Mozhaisky st., room No.301
Astana City, 010000
Republic of Kazakhstan
Tel: +7 (3172) 356 776
Tel/fax: +7 (3172) 356 770
e-mail: consultants_astana@nursat.kz
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any suggestions for updates/corrections for this notice, please let us know.