THE SOCIALIST REPUBLIC OF VIETNAM MEKONG DELTA TRANSPORT INFRASTRUCTURE DEVELOPMENTPROJECT Credit No. 4306-VN Request for Expressions of Interest CONSULTING SERVICES: SURVEY AND DETAILEDDESIGN
(Component C3i - Contract No.: CS3-PR3i-9bCT)
This request forexpressions of interest follows the general procurement notice for this project that appeared in UN Development Business No. 705 of June 30th 2007 TheGovernment of Vietnam/Can Tho City People's Committee has received a credit from theInternational Development Association (IDA) andintends to apply part of the proceeds of this credit to payments under the contract for theConsultancy Services for Survey and Detailed Design of Thoi Thuan # Thanh Loc road section under the Component C ofMekong Delta Transport Infrastructure Development Project Theservices include Site survey and investigation;Detailed design of road and small bridges; Preparation of bidding documents for civil works packages; Preparation of the requestfor proposal (RFP) for construction supervision consultancy services Theduration of the services: 2months The projectfeatures: Thoi Thuan # Thanh Loc road, Phase 1. Theroad is situated in Thot Not and Vinh Thanh districts, Can Tho city. The Scope of the Civil Works is asfollows: - Road Works
- Total Road Length: 11.9 km
- Beginning Point: Km0+000 at the intersection withNH91
- End Point: Km11+900 (Thanh Loc Commune)
- There are two distinct sections: From km0+000 to Km2+350 is the new section andsection from km2+350 to km11+900 is theexisting section but the realignment is required to avoid the erosionby the parallelcanal.
- Road Technical Class: TC40 (Class V of Flat Terrain)
- Standard Axial Load: 10 tons
- Cross-section: single carriageway 3.5m, paved shoulders 2x1.0m, unpaved shoulders2x0.5m.
- Bridge Works
- New construction of Bridges: 10 bridges of 342m in total length including Ca Cao,Rach Ban, Ut Duc, Pho Tien, T1, T2, T3, T4, T5 and T6
- Bridge Load Standard: 0.65 HL93
- Bridge Type: Reinforced Concrete
- Drainage System
- Replacement of 7 culverts: Tap Doan 2, Tha La, LoMoi, Ong Phich, Ong Xep, NgonTrau Nho, Muong Lang
- Pipe Culvert of 1000mm Diameter: 70m in totallength
The Can Tho Provincial Department of Transport under the authorization of Can Tho City People'sCommittee now invites eligible consultants to indicate their interest in providing the services. Interested consultants mustprovide information indicating that they are qualified to perform the services (brochures, description of similar assignments,experience in similar conditions, availability of appropriate skills among staff, etc.). Consultants may associate to enhance theirqualifications. A consultant willbe selected in accordance with the procedures set out in the World Bank's Guidelines: Selection and Employment of ConsultantsbyWorld Bank Borrowers, May 2004. Interestedconsultants may obtain further information at the address below from 7:00to 11:00 and 13:00 to 17:00 hours of the working days in the period from16th November to 04th December 2009 Expressions ofinterest must be delivered to the address below by 17:00 of 04th December 2009. Can Tho Department of Transport, Project ManagementSub-unit in charge of WB5 No. 1B Ngo HuuHanh street, Ninh Kieu district, Can Tho city Staff incharge: Nguyen Quang Hien Tel: (84)710-3824958 Fax: (84) 710-3810294 E-mail: cangocminh1974@ymail.com
|