EBRD - Black Sea Energy Transmission Project, Package A - 500 kV and 400 kV Overhead Lines (GE-Tbilisi)

Prequalification Notice

General Information

Country:   Georgia
City/Locality:   TBILISI
Notice/Contract Number:   eu:296706-2009
Publication Date:   Oct 24, 2009
Deadline:   Nov 24, 2009
Buyer:   ENERGOTRANS LTD.
Original Language:   English

Contact Information

Address:   ENERGOTRANS LTD.
TBILISI
Georgia
Email:   Click here

Goods, Works and Services

 

Summary

     view in:

Notice Type: 4008 - Prequalification notices
Regulation of Procurement: European Investment Bank, European Bank for Reconstruction and Developement, European Monetary Institute
EU Official Journal Publication: 206/2009, #296706-2009
Contract Nature: Works
Procedure Type: Open procedure
Type of Bid Required: Not defined
Awarding Criteria: Not defined

Original Text

     view in:

6018-PRE-39579
Project name: Black Sea Energy Transmission Project, Package A - 500 kV
and 400 kV Overhead Lines
Issue date: 19 October 2009
Closing date: 24 November 2009, 12.00 pm Tbilisi time
Reference No. OHL-001 ENERGOTRANS
This Invitation for Pre-qualification follows the General Project
Information for this project, which was published on EBRD web site on 10
February 2009 for the Black Sea Transmission project. The project consists
of the construction of an asynchronous interconnection between the 500 kV
network of Georgia and the 400 kV network of Turkey.
Funding for the project is envisaged through loans from the European Bank
for Reconstruction and Development (EBRD), the European Investment Bank
(EIB), KfW ("Banks"), funds from the EC Neighbourhood Investment Facility
(EC NIF) as well as from own resources of the Government of Georgia for
the project.
Under this project the Georgian main 500 kV transmission system between
Enguri and Zestafoni, Ksani and Gardabani shall be extended by two new 500
kV links from existing Gardabani and Zestafoni substations to a new
substation at Akhaltsikhe near the Turkish border. The Akhaltsikhe
substation shall be connected asynchronously to the Turkish 400 kV grid at
Borchka substation using a back-to-back High Voltage Direct Current (HVDC)
link at Akhaltsikhe and a 400 kV overhead transmission line.
The Project is aimed at stabilizing Georgia's power transmission network
and facilitating large scale trade of electric power between Georgia, the
other South Caucasus countries, and the countries of the Black Sea Power
Transmission Network, particularly Turkey. The Project will establish one
important precondition for the development of Georgia's vast hydro power
resources.
ENERGOTRANS Ltd, or Energotrans, subsidiary of the State owned
transmission company Georgian State Electrosystem, intends applying the
proceeds of the loans from the Banks towards the cost of the Package A,
"500 kV and 400 kV Overhead Lines", of the project, by pre-qualifying
firms or joint ventures to tender for the following contract to be funded
from part of the proceeds of the loans.
Package A will consist of the design, engineering, manufacturing, as well
as the transportation to site, unloading, temporary storage, installation
and commissioning of the overhead lines and associated equipment for the
Black Sea Transmission Network Project. Its scope will also include the
coordination at the interface points (e.g. to other packages and existing
facilities) as well as provision of all information and documents to
obtain the necessary permits for construction and commissioning.
Package A scope will include:
• Procurement of equipment and materials, construction and commissioning
of a 400 kV OHL between Akhaltsikhe substation (in Georgia) and Borchka
substation (in Turkey) (up to the Georgian-Turkish border). The total
length of the line on the Georgian territory is about 35 km and the line
shall be a single circuit line with 3 x ACSR conductors Cardinal 485/63
and an OPGW.
• Procurement of equipment and materials, rehabilitation, construction and
commissioning of a 500 kV OHL Gardabani – Akhaltsikhe - Zestafoni (in
Georgia); the total length of the line is about 247.km. The line shall be
a single circuit line with 3 x ACSR conductors of the AC 330/43, AC
300/67, AC 400/93 or AC 300/204 type and an earthwire of the Russian C 70
type and an C 70 type OPGW. The single circuit line consists of two
distinct sections:
- 187 km section between Gardabani and Akhaltsikhe substations. In some
parts of this line with a total length of ~ 86 km, 279 towers already had
been constructed earlier, which need full rehabilitation. The major part
of the line with a total length of ~ 101 km and 420 towers will have to be
newly constructed and
- 59 km section between Zestafoni and Akhaltsikhe substations. In some
sections of this line with a total length of ~ 35 km. 86 towers already
had been constructed earlier, which need full rehabilitation. The
remaining part of the line with a total length of ~ 24 km and 75 towers
will have to be newly constructed
Please note that, GSE awarded in September 2009 a contract for the
rehabilitation of towers No. 1 to No. 140 (towers and foundations only) of
the 500 kV line (out of Gardabani Substation). In follow-up of this work
it is intended that the international Contractor to be awarded package A,
i.e. to complete, string and commission the line will make his own check
of the section repaired and rehabilitated earlier by this local contractor
before starting the conductor and earthwire stringing for the complete 500
kV OHL.
Pre-qualification and tendering for the contract to be financed with the
proceeds of loans from the Banks is open to firms or joint ventures from
all over the world except otherwise it would contradict the Banks'
procurement policies and rules, or any requirement applicable in the
Employer's country.
For the purpose of prequalification, Tenderers must demonstrate that they
substantially satisfy the following minimum requirements, such
requirements being set in section 2.2 of the prequalification document
that will prevail:
• The Tenderer, respectively the leading partner in the case of tenders
from consortia/joint ventures, shall be an experienced contractor in the
field of HV transmission line construction. To qualify for award of the
Contract, the Tenderer shall be a reputed company having successful
experience as prime contractor in the execution of at least four (4)
overhead lines of similar voltage level and complexity -rehabilitation or
new construction – in the last five (5) years, each of them with a minimum
length of 30 km with at least one (1) of them outside of the Bidder's
country, preferably in countries of the former USSR, one (1) of them for
line rehabilitation and at least two (2) of them shall have a voltage
level of 400 kV or above. Evidence shall be given by end user
certificates.
Where two or more companies submit a common Bid (Joint Venture or similar
association), the lead company shall meet these requirements.
• The manufacturers shall document at least three years operational
experience of the main components.
• They are ISO 9001 and/or better certified.
• Annual sales of the Tenderer in the HV transmission line construction
sector as prime contractor (defined as billing for works in progress and
completed) over the last five (5) years of a minimum of Euro 40 million
(in case of a consortium, this applies to the leading firm) certified in
writing by a financial auditor.
• Evidence of the capability shall be supplied through an equipment list
indicating that at least three 10 t winches, three tensioners for triple
bundle (15 t), three mobile cranes (15 t), three concrete mixers and six
transport trucks are available for this Project in Georgia (year of
production of the equipment to be indicated)
• All financial declarations shall be certified by an independent
accountant.
• If a joint Tender is submitted then the parties shall be jointly and
severally liable under the contract.
• The Project Manager shall have at least 15 years of experience as
Project Manager in turnkey projects, five (5) of them in foreign
countries, in works of comparable nature and complexity.
• The Site Manager shall have at least 15 years of experience as Site
Manager for turnkey projects, including not less than seven (7) years as
Site Manager in foreign countries and two (2) assignments as Site Manager
for similar projects.
Tenderers have to furnish, as part of their Bid, documentary evidence
establishing their qualifications to perform the Contract if their Tender
is accepted.
The Pre-qualification will be based on the Tenderer meeting the minimum
pass/fail criteria aforementioned as documented by the Qualification Forms
filled in by the applicant.
Pre-qualification documents may be obtained starting from 26.10.2009 from
the Consultant, Fichtner GmbH & Co. KG, with application in writing/in
person to the address given below. This request must be accompanied by a
duly authorized cover letter, clearly stating the name of the company, the
country of domicile and the delivery address of the applicant and against
presentation of evidence of the effected bank transfer of a non-refundable
fee of EUR 100 (one hundred Euro).
The money should be wire transferred to:
Bank of Georgia, SWIFT:BAGAGE22
3, Pushkin street, 0105 Tbilisi, Georgia
Account #331415000
Intermediary Bank:
American Express Bank, Frankfurt
SWIFT: AEIBDEFX
Beneficiary: Energotrans Ltd
The Georgian companies that are going to submit tenders on their own name
are allowed to transfer the equivalent of the fee in Georgian Lari, at the
exchange rate announced by the Georgian National Bank at the date of
purchasing the pre-qualification documents, to:
Bank of Georgia, SWIFT:BAGAGE22
3, Pushkin street, 0105 Tbilisi, Georgia
Account #331415000
Intermediary Bank:
American Express Bank, Frankfurt
SWIFT: AEIBDEFX
Beneficiary: Energotrans Ltd
If requested in writing by a duly authorized cover letter, clearly stating
the name of the company, the country of domicile and the delivery address,
the documents will be promptly dispatched by courier at the Tenderer's
expenses against presentation of evidence of the effected bank transfer of
a non-refundable fee of EUR 50 (fifty Euro) payable to:
Fichtner GmbH & Co. KG,
Account no.: 12 56 882 00, Deutsche Bank AG Stuttgart,
SWIFT/BIC-Code: DEUT DE SS,
IBAN: DE62 6007 0070 0125 6882 00.
However no liability can be accepted for loss or late delivery.
Interested firms may obtain further information on the project and the
pre-qualification may be obtained at the Consultant's office address:
Fichtner GmbH & Co. KG,
Sarweystrasse 3,
D-70191 Stuttgart, Germany or
PO Box 10 14 54,
D-70013 Stuttgart, Germany,
Attention Mr. Gerhard Rudolph,
Tel.:+49-711 8995 245,
Fax.:+49 711 8995 459,
email: gerhard.rudolph@fichtner.de
or at the Employer's address:
Energotrans Ltd.
2, Baratashvili Street
Tbilisi 0105, Georgia
Tel.:+995 32 209111
Fax.: +995 32 989820
Mail: dato.nioradze@gse.com.ge
Contact person:
Mr. David Nioradze
Director
or
Mr. Jemal Akhalaia
Deputy Director
Mail: jemal.akhalaia@gse.com.ge
Whilst the procurement process and tenders need to be acceptable under the
procurement guidelines and other relevant procurement requirements of the
Banks, it has been generally agreed to follow EBRD procurement procedures
according to EBRD's ."Procurement Policies and Rules", available on EBRD's
website http://www.ebrd.com.
Specifically for the pre-qualification EBRD's guideline "Prequalification
for works, major equipment and industrial installations" will apply.
Specifically for the pre-qualification EBRD's guideline "Prequalification
for works, major equipment and industrial installations" will apply.
Additionally the evaluation procedure for the pre-qualification, and the
subsequent selection process will have to be acceptable under EIB's "Guide
to Procurement" (available on EIB's website http://www.eib.org), KfW's
"Guidelines for the Procurement of Supply and Work Contracts under
Financial Cooperation with Developing Countries" (available on KfW's
website
http://www.kfw-entwicklungsbank.de) and other relevant EIB and KfW
procurement requirements
The pre-qualification applications must be duly completed and delivered to
the addresses below, on or before 24 November 2009, 12.00 pm Tbilisi time.
Documents which are received late will be rejected and returned unopened.
One original and one copy of the pre-qualification applications shall be
submitted to:
Energotrans Ltd., 2, Baratashvili Street, Tbilisi 0105, Georgia. Tel.:
+995 32 209111. Fax.: +995 32 989820. Mail: dato.nioradze@gse.com.ge Mr.
David Nioradze, Director
One copy of the pre-qualification applications shall be submitted to:
KfW Entwicklungsbank
Dept. L III a / 3 (Europe)
Palmengartenstr. 5-9
D-60325 Frankfurt a.M.
GERMANY
In charge:
Mr. René Eschemann
Project Manager
Tel.:+49 69 7431 8753
Fax:+49 69 7431 3559
Mail: rene.eschemann@kfw.de
Another copy of the pre-qualification applications shall be submitted to:
Fichtner GmbH & Co. KG,
Sarweystrasse 3,
D-70191 Stuttgart, Germany or
PO Box 10 14 54,
D-70013 Stuttgart, Germany,
Attention Mr. Gerhard Rudolph,
Tel.:+49-711 8995 245,
Fax.:+49 711 8995 459,
email: gerhard.rudolph@fichtner.de


Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any suggestions for updates/corrections for this notice, please let us know.