FEASIBILITY STUDIES, PRELIMINARY DESIGNS, ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND SAFEGUARD PLANS FOR THE RAW WATER CONVEYANCE SYSTEM (AQUADUCT) FOR LILONGWE WATER BOARD

Contract Award

General Information

Country:   Malawi
City/Locality:   Lilongwe
Notice/Contract Number:   LWB/C/02
Publication Date:   Sep 9, 2009
Funding Agency:   World Bank
Buyer:   MW-Sec Natl Water Dev Project SIL (FY07)
Ministry of Irrigation and Water Development
Original Language:   English

Contact Information

Address:   Mr. Alfonso Chikuni
LILONGWE WATER BOARD
P.O. Box 96
Lilongwe  
Malawi
Telephone:   265 1 750 236
Email:   Click here

Goods, Works and Services

 

Original Text

     view in:

CONTRACT AWARD NOTIFICATION - QCBS

REPUBLIC OF MALAWI

LILONGWE WATER BOARD


MINISTRY OF IRRIGATION AND WATER DEVELOPMENT AND LILONGWE WATER BOARD

Project Title:
FEASIBILITY STUDIES, PRELIMINARY DESIGNS, ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND SAFEGUARD PLANS FOR THE RAW WATER CONVEYANCE SYSTEM (AQUEDUCT) FOR LILONGWE WATER BOARD

Contract number:
LWB/C/02

IDA Credit And Grant Numbers:
4307-MAI, H294-MAI

Name/address of contractor:
Hydroplan Ingenieur-Gesellschaft mbH
Prinz-Carl-Anlage 25
67547 Worms
Germany

Contract amount: US$249,375.00

Contract award Amount: US$249,375.00

Contract award date:
1 September 2009

Name of each bidder who qualified for financial opening, bid price as read out:

1. Hydroplan
USD 249,375.00

2. SWS srl Consulting
EURO370,000.00

Name of bidders whose technical proposals did not attain minimum points of 75%:

1. Luxconsult (Mtius) Ltd.
2. Pan Arab Consulting Engineers
3. Norplan Consulting Engineers and Planners

Name of the winning Bidder:

Hydroplan Ingenieur-Gesellschaft gmbH

Price it offered: US$249,375.00

Duration: The Contract period is 9 months from 1st September, 2009 to 30th May, 2010.

Summary scope of the contract awarded:
The scope of the assignment is as follows:

The scope of the assignment is in two parts. The first is to carry out a feasibility study for protecting the water source from pollution in terms of identifying the available options for practicable solutions drawing from lessons learnt from the past Consultant’s assignments of similar nature. The second is to carry out preliminary designs of the most preferred option of pollution control, but which also fits into the Board’s masterplan for development and management of water resources
Please note that this notice is for your information only.