Search

St. Michael Water Supply Line

Request For Proposals

General Information

Canada
   Alberta
   can:ab-2017-01749
   Mar 18, 2017
   Mar 30, 2017
   English

Contact information

   Chris Parfitt
Canada
   (587)772-0645

Goods, Works and Services

Ground-drainage work   Plumbing and drain-laying work   Construction equipment   Repair and maintenance services of compressors   Repair and maintenance of plant   Water-distillation plants construction work  

Original Text

      
St. Michael Water Supply Line

The work involves the construction a potable water supply line from the Heartland Reservoir and Pump Station to the Hamlet of St. Michael of approximately:

1. 22,000 m of 200 mm Dia. HDPE potable water pipeline by Horizontal Directional Drilling.
2. 770 m of 300 mm Dia. HDPE potable water pipeline by Horizontal Directional Drilling.
3. 125 m of 200 mm Dia. HDPE Pipe for Highway 831 Crossing by HDD.
4. 225m of 200mm Dia. HDPE with Steel Casing for 4 Railway crossings by Auger Drilling.
5. 14 – Gate Valves.
6. 3 – Blow-off Assembly.
7. 4 – Manual Air Release Valves.
8. Modification within the St. Michael Water Treatment Plant.
http://vendor.purchasingconnection.ca/Opportunity.aspx?Guid=176DA7BF-DD5D-4704-804C-C1E88BA04014




More information: Click here
Please note that this notice is for your information only.
We try our best to have the most accurate and up-to-date information available on our web site, but we cannot guarantee that all of the information provided is error-free.
If you have any updates, corrections, or complaints related to this notice, please contact the responsible purchaser directly.