3A-WAPP APL 2 (OMVS Felou HEP)

This buyer is a part of World Bank.
The Mali, Mauritania, and Senegal Felou Second Hydroelectric (APL) Project (WAPP APL 2) aims to: (a) augment the low cost electricity supply to the national power utilities of Mali (EDM), Mauritania (SOMELEC) and Senegal (SENELEC) as a means to alleviate widening power supply deficits that have resulted in chronic load shedding in Senegal River Basin countries (Mali, Mauritania, Senegal); and (b) develop the power system of the Senegal River Basin Development Authority (OMVS) into a nucleus power pooling mechanism that can be replicated for other sub-regions of WAPP "Zone B". This developmental objective is to be achieved, inter alia, by: (a) implementing the proposed OMVS 2nd Generation Hydropower Projects at the Felou and Gouina sites using a Design-Build-Operate-Transfer (DBOT) approach that involves deployment of date-certain, fixed price, performance-based contracts for each plant (see Figure 2 below); and (b) providing institutional restructuring and capacity building support to improve the efficiency and performance of the public-private partnership involving an OMVS-sponsored power asset holding entity (currently the Societe de Gestion de l'Energie de Manantali - SOGEM) and a private operation and maintenance concessionaire (currently ESKOM Energie Mali (EEM). As part of the ongoing restructuring of OMVS institutions5, SOGEM is to be transformed into the proposed L'Agence de Gestion du Patrimoine de l'OMVS (AGP-OMVS).

Procurement notices

Notice Type Notice Title Published Deadline
Request For Expressions of Interest SELECTION D#UN CONSULTANT POUR LA REALISATION D#UNE ETUDE A LONG TERME AUX EFFETS DE LA POLLUTION ET DE LA CORROSIO N SUR LE TRONÇON DE LIGNE ROSSO-NOUAKCHOTT (SOCIETE DE GESTION DE L#ENERGEIE DE MANANTALI) Aug 24, 2009  Sep 4, 2009 
Request For Proposals FOURNITURE ET LA LIVRAISON DE DIVERSES PIÈCES DE RECHANGES ET DIVERS ÉQUIPEMENTS DESTINÉS AUX OUVRAGES DU SYSTÈME É NERGÉTIQUE DE MANANTALI Apr 24, 2009  Jun 22, 2009 
Request For Proposals FOURNITURE ET LIVRAISON DE DIVERS ÉQUIPEMENT MÉDICAUX POUR L#HÔPITAL ET LE DISPENSAIRE DE MANANTALI, RÉPUBLIQUE DU MALI, RÉGION DE KAYES, CERCLE DE BAFOULABÉ. Apr 24, 2009  May 22, 2009 
Request For Proposals RÉALISATION DES TRAVAUX DE RÉVISION GÉNÉRALE DES CHANGEURS DE PRISE EN CHARGE DES TRANSFORMATEURS DE PUISSANCE DES POSTES HAUTE TENSION DU RIMA. Apr 24, 2009  Jun 22, 2009 
Request For Expressions of Interest ETUDE A LONG TERME AUX EFFETS DE LA POLLUTION ET DE LA CORROSION SUR LE TRONÇON DE LIGNE ROSSO-NOUAKCHOTT Apr 24, 2009  May 20, 2009 
Request For Proposals TRAVAUX DE RÉHABILITATION DES ÉQUIPEMENTS HYDROMÉCANIQUES DU BARRAGE DE MANANTALI ET DE RÉNOVATION DE LA STATION DE TRAITEMENT D'EAU Apr 24, 2009  Jun 22, 2009 
Request For Proposals TRAVAUX DE CONSTRUCTION ET D#ÉQUIPEMENT DE LOGEMENTS D#EXPLOITATION À SAKAL ET TOBÈNE (SÉNÉGAL) ET DE RÉHABILITATIO N DE L#HÔPITAL ET DU DISPENSAIRE DE MANANTALI (MALI) Apr 24, 2009  May 22, 2009 
Request For Expressions of Interest SÉLECTION D'UN AUDITEUR FINANCIER EXTERNE INDÉPENDANT POUR L'AUDIT DE LA SOCIÉTÉ DE GESTION DE L'ENE RGIE DE MANANTALI (SOGEM) Mar 9, 2009  Apr 10, 2009 
Contract Award Etude, fabrication, fourniture, travaux de génie civil, montage et essais, mise en service et assistance à l'exploitation et maintenance pendant la période de garantie de l'aménagement hydroélectrique de FELOU Jan 24, 2009   
Prequalification Notice Design-Build-Commission & Conduct extended performance testing of the proposed run-of-the-river 59MW Felou Hydroelectric Plant Dec 11, 2006  Jan 22, 2007 
Prior Information Notice AVIS GENERAL DE PASSATION DES MARCHES (ANNEE 2005) Apr 13, 2005   
Request For Expressions of Interest Sélection de consultants dans le cadre de l’assistance technique à l’OMVS pour la réalisation de l’aménagement hydroélectrique de Félou Apr 13, 2005  Apr 28, 2005 
Request For Expressions of Interest Sélection de consultants pour la réalisation de l'étude des impacts environnementaux de l'aménagement de la centrale de Félou Apr 13, 2005  Apr 28, 2005