Search      Advanced Search
Refine search
By keywords
Search
Country
Bhutan (19)
When published
Any time

Log In

Do you want to publish your tenders on dgmarket?
Click here

1-19 of 19
Country Notice Title Type Published Deadline
Bhutan Construction of Temporary Suspension Foot Bridge : across Gongri River near Gongri Dam Axis Alt-I Kuri-Gongri HE Project, Gyelposhing, Bhutan.  rfp  Sep 2, 2010 Sep 23, 2010
Bhutan Contract for Intake, Transmission Mains : etc.  rfp  Sep 2, 2010 Sep 3, 2010
Bhutan Core Drilling Works : at Shwezaye Hydropower Project, Myanmar.  rfp  Sep 2, 2010 Sep 22, 2010
Bhutan Topographical Survey Work : for Preparation of DPR of Bunakha HE Project 180 MW, Bhutan.  rfp  Aug 31, 2010 Sep 24, 2010
Bhutan Upgrading Schools and Integrated Disaster Education (UPSIDE) Project  rei  Aug 29, 2010 Sep 10, 2010
Bhutan Upgrading Schools and Integrated Disaster Education (UPSIDE) Project  rei  Aug 29, 2010 Sep 10, 2010
Bhutan Topographical survey works : for preparation of Detailed project report of Bunakha HE project 180MW.  rfp  Aug 29, 2010 Sep 24, 2010
Bhutan Design, manufacture, supply, handling, storage & Preservation (at site & store including transportation to place), Installation, erection, testing, commissioning & handling. etc.  rfp  Aug 28, 2010 Oct 15, 2010
Bhutan Survey Work : of river x-sections (with reference to NHPC established grid control points) including recording of minimum river bed level, water level, water depth @5m interval, date of  rfp  Aug 25, 2010 Sep 7, 2010
Bhutan Micro, Small, and Medium-Sized Enterprise Sector Development Project (former Small and Medium Enterprise/Micro Enterprise Devt Project) - Subproj 3 Component 3 Central Registry (Firm)  rei  Aug 25, 2010 Sep 30, 2010
Bhutan Micro, Small, and Medium-Sized Enterprise Sector Development Project (former Small and Medium Enterprise/Micro Enterprise Devt Project) - Subproject 3 Component 3 Central Registry (Individual)  rei  Aug 25, 2010 Sep 30, 2010
Bhutan Capacity Building of the Department of Roads (Piggybacked to Grant 39225-02) - Capacity Development Specialists  rei  Aug 11, 2010 Sep 9, 2010
Bhutan Supply of Various Sizes of Tyre, Tube & Flap : Rust At 504 Ss & Tc, Phuentsholing Under 19 Brtf Project (Part-B).  rfp  Aug 5, 2010 Sep 16, 2010
Bhutan Supply & stacking of stone metal (40mm), stone chips (20mm) & coarse river sand : for permanent works between km 0.00 to km 2.175 & km 2.175 to km 8.41 & km 8.41 to 15.703 on etc.  rfp  Jul 22, 2010 Sep 8, 2010
Bhutan Urban Infrastructure Development Project - Intake, Water Transmission Mains, etc  rfp  Jul 21, 2010 Sep 3, 2010
Bhutan Supply & Stacking of Stone Metal, Stone Chips & Coarse River Sand : for Re-Surfacing at India House Estate (Ihe) Thimphu Under 19 Brtf Project Inside Bhutan.  rfp  Jul 19, 2010 Sep 6, 2010
Bhutan Urban Infrastructure Development Project - Simtokha Local Area Plan  rfp  Jul 13, 2010 Sep 3, 2010
Bhutan General Procurement Notice  pin  Dec 24, 2009
Bhutan Proposed Road Network Project II  pin  Oct 19, 2009 Oct 30, 2010
1-19 of 19
Customize table - choose columns
  • Country
  • Type
  • Published
  • Deadline