General Information |
|
| Country: | Cameroon |
| Deadline for Responses: | Feb 28, 2006 |
| Regulation of Procurement: | European Investment Bank, European Bank for Reconstruction and Developpement, European Monetary Institute |
| EU Official Journal Publication: | #31219-2006 in 29/ issue |
| Publication Date: | Feb 11, 2006 |
| Awarding Authority: | AES SONEL, DOUALA |
| Contract Nature: | Combined contract |
| Procedure Type: | Call for expressions of interest |
| Type of Bid Required: | Not defined |
| Awarding Criteria: | Not defined |
| Original Language(s): | English |
Goods, Works and Services |
|
| Commodities: | |
Summary |
|
|
AES SONEL REFURBISHMENT OF THE EDEA HYDRO POWER PLANT - CAMEROON OWNER AND DEVELOPER: AES SONEL, CAMEROON INVITATION FOR EXPRESSION OF INTEREST AES SONEL is the integrated electric utility in Cameroon of which AES Corporation (www.aes.com) holds 56% shares and the remaining shares are owned by the government of Cameroon. The utility has approximately 930 MW of generating capacity of which about 90% is hydroelectric. AES SONEL is applying for a loan from the European Investment Bank -EIB- towards the cost of the Refurbishment Project. The international invitation for Tenders relates to the contract for the Engineering, Procurement, Construct, Start-up, and Commissioning of the refurbishment Project. The contract will be a turnkey contract for the below described project. REFURBISHMENT PROJECT DESCRIPTION The hydroelectric generating facility at Edéa (60 km from the Douala International Airport), on the Sanaga River was constructed from 1949 to 1975 in three phases, with an installed capacity of 263 MW. The refurbishment process will consist of the following: I- EDEA 1 - Units 1 to 3 - constructed between 1949 and 1955: Dismantling and the complete replacement of units 1-3 with the possibility of increasing the unit output. (between 16 MW and 23 MW). II- EDEA 2 - Units 4 to 9 - constructed between 1954 and 1958: The replacement of obsolete components, modernization of the shaft seal system and the possibility of replacing the turbine hub blades. III- EDEA 3 - Units 10 to 14 - constructed between 1969 and 1975: The complete renovation of the alternators (stator, rotor, exciters) and the replacement of the voltage regulators and speed governors. VI- COMMAND, CONTROL and PROTECTION Replacement of the present system with synchronized relays / Desk set control boards for the units / Centralised Control and command system in the command room / SCADA system in the control room. V- HEAVY ELECTRO MECHANICAL EQUIPMENT Rehabilitation of the following heavy electromechanical equipment to restore as new performance. - Transformers - Replacement of the 5 Transformers of EDEA III. - Lifting Cranes - coupling and braking mechanism. - Other Auxiliary Equipment - fire detection system, etc. - Intake gates - seals on the servo mechanism. - Spill way gates - Replacement of seals to prevent leakages. - Trash Rake. - Grills. - Stop logs (coffer dams). The works are expected to start on 1.7.2006. PREQUALIFICATION CRITERIA All qualified firms will be invited to participate in the bid. Qualifications by documentary evidence will include the following: 1. Experience of successful completion of turn key construction of not less than five hydro power plants, each of not less than 20 MW within the past 5 years. 2. Experience of not less than 5 years in hydro power plant equipment refurbishment. 3. Proven experience in Design, Manufacture, Erection, Commissioning, and Testing of not less than three hydro turbo alternators. 4. Confirm willingness to offer guarantees for programme, output and efficiency and agree to accept liquidated damages for failure to meet the guarantees. 5. Accreditation to ISO 90001 or Equivalent norms, submitted in pdf format. 6. Audited financial statements for the last three years, submitted in pdf format. The annual turnover acceptable is not less than 45 millions euros. (~30 billions CFA). PARTICIPATION At the moment, the Request For Proposal (RFP) documents are being finalized and after receiving expression of interest from the interested parties and pre-qualification, suitable candidates will be selected and given access to the RFP documents. To participate to this pre-qualification process, 1. Direct your internet browser to www.poweradvocate.com/ 2. Click on the 'REGISTER' button on the right-hand of your screen. 3. Complete the Registration sheet with the requested information (IMPORTANT: PLEASE INDICATE 'EDEA REFURBISHMENT' IN THE REFERRAL FIELD). 4. After registering, AES SONEL will confirm your involvement and you will receive an email informing that your registration is complete and that you have access to the platform. 5. Return to www.poweradvocate.com , log on, and download further information on this pre-qualification. You are required to respond electronically via the Power Advocate website before February 28th, 2006. This will entail uploading' any written responses to this Invitation or any other company data you wish to provide. Additionally, there are online datasheets you will be required to complete. You should not submit any hardcopy expression of interest. For questions concerning this pre-qualification process, please contact adolf.mancho@aes.com and emmanuel.moteng@aes.com. For questions concerning the poweradvocate internet platform, please contact brad.vonthaden@poweradvocate.com. AES SONEL CONTACT PERSONS Emmanuel Moteng Fohom, Projects Sourcing, AES SONEL, Rue de Koumassi, PO Box 4077 Douala, Cameroon. Tel +237 950 39 03. Fax +237 343 87 95. emmanuel.moteng@aes.com. Adolf Cho Mancho, Project Manager, AES SONEL, Rue de Koumassi, PO Box 4077 Douala, Cameroon. Tel +237 968 81 62. adolf.mancho@aes.com. |
|